Jump to content

Move Smart Battery and Power Control Station out of Sound Amplifiers tech


Recommended Posts

I posted the following thread in general discussion, and since it seemed popular, I'm making this suggestion thread.

 

I suggest that the Smart Battery be moved to Smart Home (good point, DarkMaster13), and the Power Control Station be moved to Advanced Power Regulation. (thanks for pointing that out, goboking)

Thoughts?

The Power Control Station and the Smart Battery are close to their QoL-MK3 positions in the research tree. If anything the name of the technology & the position of the Jukebot are odd.

The Smart Batteriy has been an Advanced Tech for ages and it also relies on multiple novice techs to be used properly, so I see little reason to change that. Especially since the Jumbo Battery is already exists as Novice Battery tech.

I'd much rather see the Jukebot moved back down to the decor area of the research tree and / or "Sound Amplifiers" renamed to something more appropiate for the remaining two buildings (e.g. "Power Control").

yep additionally, smart batteries can be unlocked without unlocking automation wire(Smart Home) , which makes no sense. Currently to make proper use of the Smart battery you'd need to unlock 08 different technologies(rock crusher for refined metal, super computer,etc) which is too many.

Smarts batteries should be unlocked through Smart Home IMHO.

Archived

This topic is now archived and is closed to further replies.

Please be aware that the content of this thread may be outdated and no longer applicable.

×
  • Create New...