17 minutes ago, SharraShimada said:

Whats your point? You say something about the cost, but you post a screenshot of your stock.

I think the point is that the costs of different bridges are inconsistent, with the conveyor bridge being a huge outlier. Most bridges cost the same amount of materials as a regular segment of the same type of conduit (e.g. wire bridge = 25 ore, wire segment also = 25 ore). This makes sense because they only gain you one tile of additional length to your conduit - bridges are three tiles long but you have to place a regular segment overlapping each end, so only the middle tile really counts.

So the question is, why are a few more expensive, and most egregiously why does a conveyor bridge cost four times as much as a normal section of rail?

(Also, liquid pipe requires "plumbable" materials but liquid bridge requires raw mineral, which seems odd.)

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

Please be aware that the content of this thread may be outdated and no longer applicable.

×
  • Create New...