Jump to content

Splitting power


Recommended Posts

Security regarding powerline-overloading? Just make sure, the wires are never overloadet due to many things attached to. The overlay tells you the current wattage, and the max wattage connected to. Thats pretty easy.

If you want to relay power from one grid to another, if one has sureplus, and the other a shortage, you can build a single smart battery, controling a power-shutoff via automation. If the battery is drained below X% the power-shutoff opens, and the surplus network will feed the shortage. When the shortage is over, the smart-battery will cut the powerline again, and everythin is seperated.

I just give u the way

For long distance periodical hight wattage usage.

Generation zone

 image.thumb.png.053ec049d36630ce835a69566f3773b3.png

image.thumb.png.3747244cd7248b5b0143ab3931150c15.png

Then transportation with metal wire(2kW) to usage zone (about 6kW max, Bunkers and scaners)

image.thumb.png.3c6af7dfaf0cd37e38f335344267e8bd.png

And that how i split power from 2kW to 6kW(=

image.png.492b7feb1e1eb9848eb3e537250061b3.png

image.png.078d6e68c9f0b7c3d7af7f231b797921.png

image.png.41a84cac5b7d7b80c321083d7c62c132.png

Main idea is that i need no use 2kW power every second but some time(METEORSCOOOOMING) i need to power 30 +doors in one second(i`m so lazy to create smart door opening system).

In that moment all batteries are full of charge and they give power to doors. When charge in battery low(lower than 90%) - it connect to input wire and get energy. Automatization guaranty that in one moment it will be just one output line.

 

I use such splitters in many places. For example Rest Room use 4kW+ of energy, But such system give me right to use just one  Wire in input there too.

 

 

Archived

This topic is now archived and is closed to further replies.

Please be aware that the content of this thread may be outdated and no longer applicable.

×
  • Create New...