My natural gas line coming from my NG geyser was supplying 5 NG generators in sequence and then the line goes up to a gas range. This was working fine prior to update 348553, but as soon as I patched, only 10 g/s of NG gets past the first NG generator. Previously, all NG except that needed at the moment by the input tile was forwarded on, so the line has 1000g pressure prior to inputs and then 910g pressure after the first generator, 820 pressure after the second generator, and so on. I'm not sure why this doesn't work anymore but this seems like a bug.
ONI has always worked fine with in-sequence inputs in my experience and I use this in many ways to prevent the every-other splitting that happens with pipe branches.
Place a natural gas line in sequence running through NG generators.
A developer has marked this issue as fixed. This means that the issue has been addressed in the current development build and will likely be in the next update.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now