Jump to content

Pipe build jobs cancel "dig protection" of tiles/ladders


Coolthulhu
  • Branch: Preview Branch Version: Windows Pending

Tile and ladder build designations do not produce dig designations until they get materials, so that dupes don't cut themselves off from colony too easily. But designating both tiles/ladders and pipes in the same place will allow dupes to dig there before tiles/ladders are supplied with rock.

On a side note, this is actually useful for speeding up building vertical shafts with ladders in them. The requirement to deliver->dig->build->deliver->dig->build slows the whole thing down rather heavily. With this bug exploited, it turns into much faster 4*dig->4*deliver(rate-limiting step)->4*build


Steps to Reproduce
Designate tiles and pipes on the same rock tile, watch dupes dig it before tile materials are delivered
  • Like 1



User Feedback




Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
  • Create New...