Conductive wire bridge "obstruct" placement of heavy conductive plate


Gwido
  • Branch: Live Branch Version: Windows Fixed

I was going to reconfigure a heavy wire grid, and so, want to place a heavy watt plate in floors.

But I can't place a plate, because of a bridge that should not obstruct placement.

 

To place the heavy watt plate you see on the screen below, I was forced to deconstruct the conductive bridge, wait for the plate to be constructed, and then place anew the conductive bridge :-/

Before that, the heavy plate (or bridge) can't be placed, with the error message : "obstruct by wire". Even though a bridge is allow at this location. :( 

20181013081258_1.thumb.jpg.2ec590527705d3be3b894521ef98c6df.jpg


Steps to Reproduce
Construct a bridge, and then, try to place a watt plate this one end under the bridge



User Feedback


A developer has marked this issue as fixed. This means that the issue has been addressed in the current development build and will likely be in the next update.


Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
  • Create New...