Jump to content

Wrong "Potential Load" tooltip


Sanchozz
  • Branch: Preview Branch Version: Linux Pending

the "Potential Load" tooltip shows an incorrect value.
It seems that the calculation does not take into account the potential load of child subnets of a higher nesting level connected through several transformers.

Here is an example made in the sandbox. [All mods are disabled]

2024-07-0212-21-17.png.df6cd3411edd04cc2277f94136798fd3.png

2024-07-0212-20-24.png.59cccdad75be7a3bb245966afac76bb1.png

Beeta-3.sav


Steps to Reproduce

Build a complex, extensive power grid with several levels of nesting.
Look at the Potential Load.




User Feedback


There are no comments to display.



Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
  • Create New...