`Large Power Transformer` connected on higher side to 5 `Manual Generator`s makes them blinking idle. (which causes dupes to fall off, which stop power flow, which might reassign other dupes than the one running the manual generator second ago).
Steps to Reproduce
1. Connect energy demand >2kW to `Large Power Transformer` on lower side. 2. Connect 5 manual generators to the transformer on higher side. 3. Make dupes run manual generators. You can run my testing save (see TEST2.sav.txt - remove `.txt` extension) to see the issue easily.
1. Connect energy demand >2kW to `Large Power Transformer` on lower side. 2. Connect 5 manual generators to the transformer on higher side. 3. Make dupes run manual generators. You can run my testing save (see TEST2.sav.txt - remove `.txt` extension) to see the issue easily.
- 1
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now