The power cables are not calculating on a per run level rather an entire power grid level.
The end runs should be un-effected by light cable run on a different run.
The present calculation even effects runs where the buildings are disabled or turned off via switch.
Steps to Reproduce
Have an electric system that uses both heavy gauge wire as the backbone and normal wire as the tails.
Have an electric system that uses both heavy gauge wire as the backbone and normal wire as the tails.