i tried to replace some heavy wire made of iron ore with some heavy conductive wire made of iron.
i set the priority of the task as 7 about halfway through with the replacement.
then went to the priority screen to set all the tasks to 7.
they were all set to 5.
I think the task didn't take on the priority of what I had set.
Steps to Reproduce
lay down some heavy wire. let it build. try to lay down heavy conductive wire over it with a higher priority than the default. check if that task was laid out at a 5 instead of the priority that was selected.
lay down some heavy wire. let it build. try to lay down heavy conductive wire over it with a higher priority than the default. check if that task was laid out at a 5 instead of the priority that was selected.
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now