Jump to content

Buildings change priorities while using deconstruction tool on another structures


bzzz
  • Branch: Live Branch Version: Linux Pending

Buildings lose their priorities when deconstruction tool is used over other entities in the same area.

There is an example on screenshots

1. Priorities before deconstruction

Default_047.png

2. Deconstruction area on ventilation overlay

Default_053.png

3. Priorities of the same buildings after marking for deconstruction

Default_059.png

Priorities should not have changed, but they all switched to 5.

Dreamland.sav


Steps to Reproduce
Load save file, mark gas pipes for deconstruction (as shown on second screenshot), look at changed priorities.



User Feedback




Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
  • Create New...