Jump to content

[220294] layer of water-in-pipe should be bottom


thanhdat2212
  • Branch: Live Branch Pending

the grey "ball" :D:D

2017_06_21_16_24_01.png


Steps to Reproduce
just build breeze on top of water pipe and let water running



User Feedback


There are many issues with layering. Dupes change their layers (in showers?) and then sit behind tables, compactor indicators decide to go hide behind their compactors, gas bridges draw on top of buildings in front of them, pipes are drawn behind geysers, etc etc. I guess it will need some large cleanup pass one day because that's not comething that can be solved by small ad hoc changes.

  • Like 1

Share this comment


Link to comment
Share on other sites



Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
  • Create New...