So because you added the backwall as a diggable thing the old flow for constructing over natural tiles logic need an upgrade in order to handle the new layer. It should allow the digging of the backwall while the construction occurs on the "front" level
Steps to Reproduce
Steps:
- Have only a backwall section without normal natural tiles.
- Order some building over it, in my case power cables.
- Select the digging tool and check the option to dig the backwall
- Try digging the back wall under the construction
Expected: The back wall is selected for a dig errand
Actual: The back wall is not being selected for digging.
-
1
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now