This was intended to be a priority joint - draw water straight from a geyser and only if it runs out, to draw water from the reservoir. Unfortunately it does not work the intended way and for some reason the water goes through the bridge instead of being pulled through the pipe.

Here's overall setup. As of my knowledge, it should be correct, first joining all outputs, then branching to inputs.

It can be remedied by puting a bridge behind the joing, but I believe that should not be necessary.

I also have found that if I keep cutting branches, this is where it starts working:

And this is the minimum step necessary to make it stop working correctly:

I believe a pipe split somewhere downstream should not be affecting behavior od a bridge in such manner.
Load attached save, check the reported junction and its behavior.
-
1
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now