The Airflow/Mesh Tile must be on the "north" side of the heat donor tile, if its "south" o sides no heat transfer occurs.
Steps to Reproduce
Put a metal tile or metal door at 1000°C in a vacuum room in debug mode (complete vacuum), construct an airflow tile on top and below, the top airflow tile starts heating very fast while the one below the metal tile doesnt.
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now