darknessiswes Posted December 17, 2017 Share Posted December 17, 2017 Piles of resources need transfering to project location. Tired with duples runing through enless cycles to clean up the base. We suggest a solution to this issue with a minor updates such as: 1. Duples can hook up a nearby storage compacitor then drag a tube in background layer to suck huge piles of resources 2. It can toggle between load and unload modes which help duples directly transfer contruction materials to on-site projects. 3. Via load and unload modes, 2 compacitors can siphon materials, of course, with a cost of energy consumption. 4. Hypothetically, it increases overall performance by reducing amount of works require for duples, saving both time and energy. I don't give personal opinion on this topic. Just keep it tidy for developer to have a look. Link to comment https://forums.kleientertainment.com/forums/topic/85529-industrial-vacuum-cleaner/ Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.
Please be aware that the content of this thread may be outdated and no longer applicable.