Archived

This topic is now archived and is closed to further replies.

Please be aware that the content of this thread may be outdated and no longer applicable.

emrah8

oxygen not included thermal upgrade Pipe Blocked?

Recommended Posts

emrah8    1

What should we do this warrning?My  bathroom  and  toilet dont work . :(

Share this post


Link to post
Share on other sites
AlexRou    183

I do not see your out ports being connected to anything? 

Share this post


Link to post
Share on other sites
heckubis    58

you don't have any drainage at all the drain pipes need to go someplace and none of your showers is ever going to go a full cycle of shower

Share this post


Link to post
Share on other sites
emrah8    1
13 hours ago, AlexRou said:

I do not see your out ports being connected to anything? 

How? All schema are stable but new update needing to build Waste well.After that we should use these contamine water for Potable water 

Share this post


Link to post
Share on other sites
sai05    12

Restart the game / rejoin / reload :) its bug when you made something chage its become stuck

Share this post


Link to post
Share on other sites
Twitchi    6

Also you have very short outlet pipes before they join your main waste pipe.. These can easily get backed up, and if waste back up into a toilet\shower the dupes will leave it and not carry on

Share this post


Link to post
Share on other sites