DotNet

  • Content count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About DotNet

  • Rank
    Junior Member
  1. When I want to replace or upgrade my normal pipes (gas and liquid) to insulated or radiant pipes, I will choose the new pipe type from the build menu and directly place on top of the existing pipes. But the problem is, no matter what priority is set in the build menu, the actual priority applied to the scene is always 5. Ok although I can still change the priorities in the priority screen afterwards, but this is annoying. The same problem occurs when replacing normal wire / conductive wire / heavy wire. P.S. It seems that I cannot just replace the pipes with different materials of the same type (e.g. replacing normal pipe of Granite to normal pipe of Igneous). I don't know if it is bug? Because I can replace solid tiles with different materials of same type...